Project Description:
Subcontract: Excavation and Disposal
Scope of Work:
- Excavation: Our team is responsible for the thorough excavation of the designated site for the Ellington Hotel 3-Residential Building project.
- Material Disposal: All excavated materials will be efficiently disposed of, ensuring compliance with Dubai Municipality (DM) regulations.
- Logistics: The excavated material will be transported to a DM-approved location using 2XL trucks, each with a capacity of 35 cubic meters per trip.
